Quality is the core of everything we do. We manufacture with quality-tested raw materials and precision manufacturing processes, aiming for consistent performance in demanding industrial conditions. Each product is tested and inspected by experienced staff before shipment.
Inspection and testing stages
| Stage | What is checked |
|---|---|
| Incoming material | Material grade verification against order requirements |
| In-process | Machining dimensions, ball and seat finish, critical fits |
| Assembly | Component identification, torque, stem and gland assembly |
| Pressure testing | Shell and seat tests as per applicable standard |
| Final inspection | Dimensions, end connections, operation, marking and painting |
Testing standards
Depending on the product, valves are tested as per API 598, API 6D, BS EN 12266 or ISO 5208. Please specify any project-specific test requirement in your enquiry.
Design standards
Our valves are designed to API, BS, DIN, MSS and JIS specifications. End connections are available to ANSI, DIN and BS standards. NACE requirements for sour service can be met on request.
Third-party inspection
We welcome third-party inspection as per customer requirement. Inspectors can witness testing at our Kathwada GIDC works in Ahmedabad.
Registration
Shree Ganesh Engineering Works is a Udyam-registered manufacturing enterprise (Ministry of MSME, Government of India), registration number UDYAM-GJ-01-0170852. Copies of company documents are available on request.
